There are a few things in which specific acceptance criteria for tests and inspections is designated based upon which service is applied (Structural-Clause 2, Pipeline Clause 3, or Pressure Piping Clause 4).
That criteria includes both production welds and guided bend tests for procedure (clause 5) and performance (clause 6) qualification. Additionally, there are some differences in visual acceptance criteria for porosity on welder tests. But that’s another story!
For Tensile Tests, the criteria is the same. See below.
There is no need to memorize this but be prepared to look it up. Para 5.4 gets us in the context of Procedure Qualification Acceptance Criteria then search down for Tensile Test Requirements and all you need to know is right there.